Cylinders to break
24 hr, 7 day and 28 day, 2 cylinders eachComing up (next 7 days)
| Due | Age | Mix | Pour | Ticket / batch |
|---|
Strength curve
Average psi of all pours per mixMix scores
How the overall score works
Each part is scored 0 to 100, then weighted. Parts with no data yet are left out and the rest re-weighted. Strength: 28-day average vs design; 85% of design scores 0, 115% scores 100. Consistency: pour-to-pour variation of 28-day results; 0% scores 100, 15% or more scores 0. Cost: cheapest mix per yard scores 100, others in proportion. Workability and Appearance: average crew rating out of 5.
All pours
| Poured | Mix | Ticket / batch | Slump | Air % | Conc °F | Air °F | Sand % | 24 hr | 7 day | 28 day | Work | Look | Tech |
|---|
Tap a row to edit it. Break columns show the average of the two cylinders.
Cost per yard by mix
From each mix's design quantities per yd³. Once every material in a mix has a price, this cost replaces the manual cost on the mix and feeds the Cost score.